banner
banner
banner
banner
banner
banner
banner

Rail Transfer Guide(Rail Threader)

This rail transfer guide is designed for the transportation of railway tracks,its equipped with hydralic tiltrotator. Vertical and horizontal rollers provide low-resistance support, allowing the guide to move effortlessly along the steel rails, completing the movement and transportation of tracks. Additionally, the guide is equipped with a gripping clamp mechanism, enabling precise adjustment of the rail position during operation.
Send Inquiry Download
  • Product Description

This rail transfer guide(Rail Threader) is designed for the transportation of railway tracks,it equipped with hydralic tiltrotator,it is an efficient rail handling attachment for railway maintenance construction. Vertical and horizontal rollers can provide low-resistance support, allowing the guide to move effortlessly along the steel rails, completing the movement and transportation of tracks. Additionally, the guide is equipped with a gripping clamp mechanism, enabling precise adjustment of the rail position during operation.

product-1-1

Specification

 

ltem/ModelTNZYJ75
Applicable Models(ton)6-9
Applicable rail type(mm)43/50/60/75
Tilt angle45
Rotation angle360
Flow rate(L/min)18-38
Maximum working pressure(bar)220
Finger clip opening(mm)310
Clamp opening(mm)81
Mechanical clamp opening(mm)176
Weight476
Package size1200*1000*950

 

product-1-1

 

Key Features

Hydraulic Tiltrotator System
Allows full rotation and tilt control, providing unmatched flexibility in rail positioning and alignment.

Vertical & Horizontal Rollers
Low-resistance rollers ensure smooth, effortless movement of rails along the guide, minimizing friction and wear.

Gripping Clamp Mechanism
Integrated hydraulic clamps provide secure grip and precise adjustment of track position during installation or removal.

Heavy-Duty Construction
Built from high-strength alloy steel to withstand the demanding conditions of rail maintenance and long-term operation.

Easy Integration
Compatible with various excavators and railway maintenance machines for fast connection and operation.

 

Application

Railway track installation and replacement

Rail maintenance and logistics operations

 

FAQ

Q1: How often does the product need maintenance?
A1: Regular maintenance is recommended every 500 hours of operation, including checks on hydraulic systems, lubrication, and inspection of wear parts. Tiannuo provides comprehensive maintenance guides and support.

Q2: Can the product be customized?
A2: Yes, we offer customization to meet the specific requirements of your railway maintenance projects. Contact us to discuss your needs.

Q3: What is the delivery time for the product?
A3: Our standard delivery time is 2-4 weeks, depending on the level of customization required.

 

Contact Us

Ready to optimize your railway maintenance operations with a high-performance Rail Transfer Guide(Rail Threader)? Reach out to us at arm@stnd-machinery.com to discuss your needs and receive a personalized quote.

Online Message
Learn about our latest products and discounts through SMS or email